Healthcare and Hospitals

 

Image Courtesy of UCSF

Helen Diller_MicroEstimating.jpg

Featured Healthcare Projects


Healthy cost estimating.  

MicroEstimating has delivered successful cost estimating for large healthcare buildings across Northern California, from hospitals to research laboratories to outpatient facilities.


 

Hospitals & Medical Office Buildings

 
 

Chinese Hospital
San Francisco, CA

New 8-story, 88-bed hospital encompassing state-of-the-art imaging department, 4 surgical rooms 8 or rooms, IC rooms, pharmacy. $109 million construction budget. 100,000 sf. MicroEstimating provided a detailed comprehensive estimate for concrete frame and drywall and validated the estimate provided by the CM GC firm.


Contra Costa Regional Medical
Center Renovation

Martinez, CA

Worked with the design team to study various configurations for converting patient rooms from the psychiatric unit to the medical surgical unit. Studies ranged from a 20-bed to a 30–bed conversion, with the larger number including an addition to match the existing hospital rooms. The 10,000 sf renovation included demolitions, new partitions, new finishes, fire sprinklers, plumbing, HVAC, electrical, fire alarm, life safety and medical gases.


Hillcrest Hospital Seismic Improvements
UC San Diego

Preconstruction services for seismic upgrades to the pedestrian bridge on campus. The majority of the utilities that serve the main hospital at Hillcrest are suspended beneath the bridge. The $5 million project will upgrade the lateral force resistance capacity of the existing bridge.


Hoover Pavilion Medical Office Building, Stanford University
Palo Alto, CA

Preconstruction services for the $53 million renovation and upgrade of the 5-story, historically significant Hoover Pavilion, originally a hospital building. The facility will serve as a medical office building to accommodate private practice physicians being relocated from 1101 Welch Road. the 85,000 sf facility will undergo extensive renovation and upgrades to meet the needs of its new tenants for medical offices, laboratory facilities, and surgery suites.


Kaiser Permanente Richmond Medical Center Expansion
Richmond, CA

Cost estimating services for a $22 million renovation covering 30,000 sf of space. This was phased work which included upgrades of numerous mob functions and the entire HVAC and electrical systems. The areas included in the renovation of the emergency department, material management, ultrasound, med/surgical units, inpatient pharmacy, physical therapy, administration and sleep rooms were also renovated and expanded in the main hospital, medical office building and leased space.


Kaiser Permanente Shadelands Medical Office Building
Walnut Creek, CA

Preconstruction and construction management/ general contracting services for an $11.2 million phased project to convert office buildings into medical office space. The first phase encompassed a 90,000 sf renovation of three low–rise office buildings into medical office space to house a pharmacy, diagnostic imaging facility, clinical EKG laboratory, and the physical therapy and obstetrics/ gynecology departments. The second phase entailed tenant improvements to a 20,000 sf area to house the optometry and ophthalmology departments.


VA Hospital, Building 700, Fourth Floor
Mather, CA

This 20,000 sf remodeling project transformed patient rooms into state-of-the-art patient rooms over the course of three phases. Project value over $4 million.


Wellness Center, Contra Costa County Regional Medical Center
Martinez, CA

The Wellness Center project is a new 9,600 sf, single-story facility located across from the Contra Costa Regional Medical Center. The design build project construction budget was estimated at $5.9 million.


UC San Francisco Benioff Children's Hospital
San Francisco, CA

Renovations of the Fluoroscopy Room 350 and Orthoscopy Room 326 for two new MRI unit replacements. The work encompassed remodeling of the existing rooms, including demolition, new finishes, and a mechanical, electrical and plumbing upgrade to accommodate the new MRI units, one from Siemens and one from GE.

 

Gilead Sciences Corporate Research Campus Master Plan

MicroEstimating provided cost estimates for the 5–year master plan for Gilead's corporate research campus in Foster City. Estimated at $60 million, the campus includes administrative and manufacturing facilities, chemical laboratories, and warehouses.

 
Pharmaceutical_MicroEstimating.jpg
 

Medical & Pharmaceutical Research and Laboratory

 
 

Alza Corporation New Oros Manufacturing Facility Master Plan
Vacaville, CA

Provided a new master plan for a proposed $215 million expansion at Alza’s Vacaville facility. The project encompasses a 160,000 sf pharmaceutical manufacturing facility including a 30,000 sf administrative building; 60,000 sf manufacturing facility; 10,000 square feet of laboratories; 30,000 sf of warehousing; and 30,000 sf of other buildings with the associated site improvements and validation package.


Children’s Hospital Oakland Research Institute Renovation & Seismic Upgrade
Oakland, CA

Renovation and seismic upgrade of a 13,000 sf area to create a state–of–the–art research laboratory. The facility is located in an historic building complex. The project preserved the character of the complex, including preserving and salvaging historic building materials and components.


Genentech Cell Culture Plant 2
Vacaville, CA

Cost estimating services for the 450,000 sf expansion, making it the largest biotechnology fermentation facility of its kind in the world. project added a new manufacturing facility and a new infill building along with doubling the size of the central utility plant and expanding an existing warehouse and spine.


Genentech Vacaville Site Work Complex
Vacaville, CA

Estimating the entire major parking and onsite utilities, including earthwork, temporary parking for during construction, major concrete pavements, asphalt paving, light poles, major utilities such as storm, sewer and water lines, landscape and irrigations and all other related site work.


Gilead Sciences Corporate Research Campus Master Plan
Foster City, CA

Provided a 5–year master plan for this corporate research campus, estimated at $60 million, that includes administrative and manufacturing facilities, chemical laboratories, warehousing and 30,000 sf of ancillary buildings. MicroEstimating also worked on tenant improvement projects including a pilot plant and GMP storage facility and new data center.


UC San Francisco Helen Diller Family Comprehensive Cancer Center Research
San Francisco, CA

Cost estimating services for the redundant system to power critical loads for the new cancer research facility at the Mission Bay Campus. The new 162,000 sf Facility, designed by Rafael Vinoly, includes 46 laboratories, full and half–floor research pavilions, technology center, offices, and meeting and conference facilities. The facility supports 414 researchers applying the newest biomedical advances to cancer in state–of–the–art laboratories.

 

Contact Us


We would love to work with you. Contact us today and we’ll get back to you as soon as possible.