Featured k-12 education Projects
Kids first.
School systems are the lifeblood of our communities. Financed by the hard-earned wages of local residents, school buildings have to be built on budget. MicroEstimating keeps teams focused on delivering realistic designs within funding.
LA HONDA-PESCADERO UNIFIED SCHOOL DISTRICT
Pescadero Elementary School
Pescadero, CA
Cost estimating services to determine the more cost effective of two scenarios that encompassed a complex renovation or new construction to replace school buildings damaged by flooding. Building a new 15,668 sf facility at an estimated $4.2 million was the preferred option.
NONprofit
PAL (Police Activities League)
Redwood City, CA
New 15,000 gsf, two-story, steel frame, concrete slab on grade, stucco exterior building for the Redwood City Police Department. The project was designed by EDS. PAL is a non-profit community-based organization providing intervention, prevention, and alternative programs to at-risk and economically challenged youth.
SAN FRANCISCO UNIFIED SCHOOL DISTRICT
Alice Fong Yu Middle School Renovation & Expansion
San Francisco, CA
Renovation and expansion of an existing, historically-significant elementary school with addition of a new 15,000 sf middle school complex to create the first Chinese language immersion school in the country. The project included three new buildings. $4 million.
ER Taylor Elementary Modernization
San Francisco, CA
Construction cost estimating services for the modernization of ER Taylor Elementary School included making the facility ADA compliant. Working with VBN Architects, MicroEstimating provided a series of estimates during the design process.
Guadalupe Elementary Modernization
San Francisco, CA
Project was a modernization of the campus through 2006 Proposition A Funds. Both the site and the buildings were upgraded to health, safety, instructional, and accessibility standards. Bathrooms were fully upgraded; electrical and mechanical systems upgraded; classrooms renovated. KYA Architects. $6.9 Million.
Sunset Elementary Modular Classrooms
San Francisco, CA
This new bungalow design showcases three modular classrooms in the same space. Clerestory windows provide daylighting on all four sides of each room and ample cross-ventilation.
Yick Wo Elementary Modernization
San Francisco, CA
General modernization of the entire campus including ADA, fire/ life-safety and health safety upgrades, multi-purpose room addition, hazardous material remediation, site work and interiors. Architect: Kendall Young Associates. $4.5 million.
SAN MATEO–FOSTER CITY UNIFIED SCHOOL DISTRICT
Fiesta Gardens Elementary School
San Mateo CA
Renovation and two new buildings, an outdoor stage, a lunch shelter, and major renovation of the grounds, utilities, and landscaping. $14 million.
College Park Elementary School
San Mateo CA
Complete modernization of existing site and buildings to health, safety, instructional, and accessibility standards; a new building shell for administration was constructed, and three new pre-engineered buildings installed. $19 million.
SAN RAMON VALLEY UNIFIED SCHOOL DISTRICT
Bollinger Canyon Elementary
San Ramon, CA
Constructibility reviews for three new facilities on the campus: the 5,307 sf administration building, 3,351 sf kindergarten building, and 4,744 sf library.
California High School
San Ramon, CA
Constructibility review for the $14 million Phase III program at California High School that includes a new 12,210 sf gymnasium and the renovation and modernization of the existing theater.
Diablo Vista Middle School
Danville, CA
Cost estimating services for the new 15,000 sf, $5 million gymnasium that includes basketball, volleyball and badminton courts, retractable bleachers, restroom and locker room facilities.
Greenbrook Elementary School
Danville, CA
Constructibility reviews for three new facilities on the campus: a 5,307 sf administration building, 4,550 sf kindergarten building, and 4,744 sf library.
John Baldwin Elementary
Danville, CA
Constructibility reviews for three new facilities on the campus: the 5,307 sf administration building, 3,351sf kindergarten, and 4,744 sf library.
Monte Vista High School
Danville, CA
Constructibility reviews for this measure a project which includes a new 3–story classroom building with 18 standard classrooms, culinary arts and science laboratories; addition to the commons building to provide adequate indoor dining area for the campus; and a new career technology building.
Pine Valley Middle School
San Ramon, CA
Constructibility reviews at 50% and 100% construction documents and a cost estimate for a $22.5 million modernization of this 74,000 sf facility encompassing two existing buildings, a new library facility and covered walkways.
Rancho Romero Elementary
Alamo, CA
Constructibility reviews for replacement of portables with four permanent classrooms including a computer classroom. The project included replacement of the existing school roof and covered walkways.
San Ramon Valley High School
San Ramon, CA
This new classroom building project allowed the district to provide students and staff with much needed state-of-the-art facilities featuring 21st century classrooms. $46 million.
Vista Grande Elementary School
San Ramon, CA
Constructibility review for a 5–building expansion and modernization. The project consists of the renovation of four existing classroom buildings, the replacement of six portables with a new classroom building and the addition of a 7,000 sf new multi–purpose building with a stage/classroom, kitchen, storage, and support facilities. This building and entry serves as a new campus gateway. Construction of the project was phased to minimize disruption to the campus.